THE PENNSYLVANIA STATE UNIVERSITY BEAVER STADIUM NORTH EGRESS RENOVATION

penn state beaver stadium 10x8 markets size
penn state beaver stadium 10x8 markets size
previous arrow
next arrow

THE PENNSYLVANIA STATE UNIVERSITY BEAVER STADIUM NORTH EGRESS RENOVATION

The Beaver Stadium North Egress Renovation is a stadium renovation project delivered in two phases. Phase I of the project consists of the addition of four new ADA accessible restrooms and two new storage buildings at ground level on the north end of the stadium and the renovation of the existing grandstand structure and ramps to accommodate ADA seating at the lower bowl. Phase II of the project consisted of the demolition of the existing interior ramps at the north end of the stadium and the addition of two new egress stairs, two new escalators, and four new elevators. The renovation also included the extension and infill of the concrete slab at the main and upper concourse levels where new restrooms and new concession buildings are provided.

  • Two-phased stadium renovation
  • Four new ADA accessible restrooms and two new storage buildings
  • Renovated grandstand structure and ramps to accommodate ADA seating
  • Demolished existing interior ramps
  • Added new egress stairs, escalators, and elevators