750 East Broad Street Mixed Use Development

750 e broad st
750 East Broad Day Corner
previous arrow
next arrow
750 e broad st
750 East Broad Day Corner
previous arrow
next arrow

750 East Broad Street Mixed Use Development

This new four-story residential project for Arch City Development consisted of 67 units on just under one acre. Korda assisted in building footprint developed to minimize the adjacent overhead power lines. We prepared permit drawings for water service, storm sewers (CC Plans) and final site compliance. We coordinated sanitary services with the City of Columbus which consists of connecting to an old brick sewer. We directed the stormwater detention system design which was a structured system under the building which required structural and plumbing design assistance and permitting. This project also includes limited sidewalk and parking improvements to the adjacent building.

  • 4-Story residential
  • Stormwater detention system design
  • Sidewalk and parking improvements

SERVICES KORDA PROVIDED: