Civil Engineering

OEC EXPO 2050 Phase 1

OEC EXPO 2050 Phase 1

OEC Expo Master Plan 2050 To start implementing the Ohio Exposition Center’s 2022 Masterplan, Korda is providing full service surveying...
Broadway Reconstruction

Broadway Reconstruction

Broadway Reconstruction Broadway Street was reconstructed from Park Ave (US40) to Bechtle Avenue, approximately 4300 LF, in the City of...
SCI-73-11.93

SCI-73-11.93

SCI-73-11.93 Korda was retained to prepare a Structure Type Study and Hydraulic Report for the replacement of two structurally deficient...
MAD-29-5.98

MAD-29-5.98

MAD-29-5.98 Korda prepared a study that resulted in the recommendation of a single-lane modern roundabout at the intersection of SR29...
MOT-70-17.83

MOT-70-17.83

MOT-70-17.83 Korda designed the rehabilitation of the existing curved 4-span steel beam bridge carrying Bridgewater Road over Interstate 70. The...
North Market Tower

North Market Tower

North Market Tower Korda was involved with the opportunity to create the new North Market Tower, catalyzing future development for...
Jaeger Square

Jaeger Square

Jaeger Square Located in the city’s central business district, this new multi-story, mixed-use structure is being designed, in part, with...